Tickets Please.

On my first day observing Stride's Career-as-a-Platform team, sprint planning started at 8 AM and was still going at 6 PM.

That wasn't an unusual day. The whole team, product and design and engineering together, was on Zoom for eight hours, every day, trying to figure things out in real time. Designers were making mockups during the meetings. Engineers were coding before anybody understood the requirements. The business analyst was working 12- to 14-hour days. And when I pulled the data from the work management system, tickets were averaging four to six weeks of cycle time and containing only three to four days of actual work.

The team was 80 people. It was five months past its launch date, and eight months in, it hadn't shipped a single feature to users.

Think about how that must have looked from the outside, because leadership wasn't asleep at this. They could see a team that was working incredibly hard and producing almost nothing, and they did what most people would do. They hired a product manager, who quit after two months. They cycled through three project managers. They brought in consultants, and they expanded the offshore engineering contract to 60 people. Every one of those moves was aimed at the time people spent working, and about 90% of the elapsed time on those tickets was something else: waiting, context-switching, or doing the work over.

Flow efficiency is how much of the calendar anyone was actually working

Flow efficiency is the share of an item's total elapsed time that somebody was actively working on it, as opposed to it sitting in a queue, waiting for an answer, or blocked behind something else. You take the active time, divide by the total time from start to finish, and you get a percentage that's usually lower than anybody in the company wants to believe.

You'll sometimes see a claim that knowledge work typically runs at 5% to 15% flow efficiency. It's repeated all over the place, and as far as I've been able to tell, nobody can trace it to actual data. The best published dataset I've found is from Nick Brown at ASOS, who looked at 63 teams over twelve months and found values ranging from 9% to 68%, with an average of 35%. That's one company, and its author makes the point himself that this should always be talked about as a range, and that anyone quoting you a single typical number deserves some suspicion.

So I'm not going to tell you what your number should be. I'll just tell you that Stride's was very bad, and that it took pulling the ticket data to see it.

Waiting doesn't feel like waiting from the inside

Waiting usually sounds like someone leaning back in a chair, and on this team it looked like a full calendar. People were on a call all day. Work got built before anyone had agreed what it was for, so it came back to be done again, and things got started and set down and picked up later, and a status field can't tell any of that apart, because it says "in progress" either way.

The Slack channels said it better than I could. Engineers were writing "We're coding before we understand what we're building." Designers were writing "I can't be creative in 30-minute Zoom windows." Product people were writing "We're deciding without research." Everyone knew they were failing, and in my interviews no one could say why.

Eight hours of meetings felt productive because everyone was doing something, and that's the trap. If you'd walked through that team on any given afternoon, you'd have concluded that these people needed help keeping up. They didn't need help keeping up. They needed an uninterrupted hour.

Faster coding barely moves delivery

This is the part that's become urgent, and it's why I wanted to write about a story that's a few years old.

If 90% of your calendar is something other than working, you can do some simple arithmetic about what happens when the working part gets faster. Carter Musick at Sigao laid out the arithmetic: take a work stream where 5% of the elapsed time is active, cut the working time in half, and your lead time improves by about 2.5%. The working minutes got faster, and the waiting hours didn't change at all.

The research on AI coding tools has started to look a lot like that arithmetic. Leon Musolff at Wharton, with Mert Demirer and Liyuan Yang at MIT, tracked more than 100,000 developers on GitHub, and Wharton's write-up reports that the latest generation of tools lifted coding activity by a cumulative 180%, and that this translated into a 50% increase in software projects and a 30% increase in releases. In the authors' words, "the binding constraint appears to be shifting from writing code to reviewing, integrating, and ultimately distributing it." A separate field study by Fei Liu and Todd Mckinnon in Communications of the ACM found engineers felt better and worked fewer hours with GitHub Copilot, and it found "no statistically significant improvement" in monthly pull request volume or lines of code. They called that the efficiency-throughput gap.

I use these tools every day and I'm not telling you they don't help. They've changed what I can do by myself, and I'm not a software engineer. But if you run a team that resembles the one I walked into, and somebody's shown you a chart of how much faster the code gets written, I'd want to know how much of your calendar that chart is measuring.

What removed the waiting at Stride

None of what we did was exotic, and the team didn't get any more talented in those 90 days, because they had been talented all along. The business analyst was good, the junior PM showed real promise, and the designers were excellent. They just hadn't been allowed to think.

So we gave each function protected time. Communication went async-first, with a small number of intentional live conversations and clear handoffs, and every meeting that survived got a time box and an agenda. Requirements had to be defined before work started, which sounds so obvious that I'm a little embarrassed to type it, and it put an end to making decisions in the middle of build sessions. We set up a real definition of done with automated testing, and we built a now/next/later roadmap so that people could see what was coming and stop being surprised by it. And we started asking why each piece of work existed at all, which got rid of a good deal of it, because the answer was very often "an executive told us to."

Within 90 days, cycle time had gone from four to six weeks down to five to seven days. Meeting time went from more than eight hours a day to about 20% of the schedule. Rework fell from 60% of the team's capacity to 15%, and throughput tripled, and the team that had gone eight months without shipping anything delivered its first major release.

The fix wasn't working harder or hiring more people, and they'd already tried both.

Before you add another person or another tool

If your team is late, and you've tried the things that seem like they should help, I'd pull your last ten or twenty finished tickets before doing anything else. For each one, find out how long it took from start to finish, then ask the person who did the work how many days they actually spent on it. You don't need a tool for this and you don't need the number to be precise, and I think you'll find the gap between those two figures is the most interesting thing anyone's told you about your company this quarter.

Then go look at where the difference went. It's usually sitting in somebody's calendar, and there's a decent chance that calendar is yours.

–Matthew

More Field Notes

  1. Consulting Operations

    At Microsoft, Two in Three Ideas Didn't Improve the Metric. The Build Was the Cheapest Part.

    The cost of building the wrong feature mostly arrives after launch, in maintenance, lost focus and people who quit. Here's what that looked like.

  2. Consulting Operations

    Staff Tried to Post a Status Update and Deleted the Entire Website

    Knowledge bases go stale when the people who know things can't update them. In a small firm, that usually means the firm's memory is one person.

  3. Consulting Operations

    Trust Brings Readers Back. It Doesn't Make Them Pay.

    When engaged users won't pay, the fix is rarely a better ask: find out why they come back, then walk the flow they actually see.

Want help running a sharper practice?