Flopp and Twitch: The Panic You Shouldn't Relay

Leadership escalations are the most common reason product priorities change, and most of the panic reverses within days. A leader's job is to absorb it.

5 min readBy Matthew Stublefield
A red sticker that says "Don't Panic"

A manager comes out of a meeting with something they overheard, or there's a rumble about the budget, and it rolls downhill fast. We've got to do this right now. Drop everything and start on this. The budget's getting cut, there might be layoffs, whatever it is this time. Everyone gets pulled into a conference room, the plan for the week gets thrown out, and the team starts on the new emergency.

Then, two days later, it reverses. Never mind, the budget's fine. Never mind, something else happened. And the manager who relayed the alarm has already stressed out the whole team, tanked their focus, and knocked their work off course for a week or two, all for something that turned out not to be real.

I call that pattern Flopp and Twitch: the reactive, sky-is-falling panic that comes down from above. In my experience, the leader's job is to absorb it, not relay it, because most of it reverses before it ever needed to reach the team.

Escalations are the most common reason priorities change

This isn't a rare event. Product-Led Alliance and ProductPlan surveyed nearly 250 product professionals for their State of Product Management 2026 report, and asked what most often overrides their prioritization. The top answer, from 60.2% of respondents, was leadership escalations or new directives. Sales or customer escalations came next at 38.5%, then revenue or commercial pressure at 38.1%. Asked how often priorities change after they've been agreed, respondents averaged 3.3 on a five-point scale, which means agreed priorities are revisited a lot more often than anyone plans for.

ProductPlan's own reading of the escalation number is a good one. An escalation, they wrote, is "the moment executive accountability meets incomplete traceability" – a leader who's accountable for results and can't see the reasoning behind the current plan reaches for the one lever they're sure of, which is telling everyone to stop and do something else.

If you're the CEO, some of these alarms start with you, and that's normal. You hear things first, you're the one the board calls, and sometimes the alarm is real. The trouble is the alarms that aren't, and how much they cost by the time anyone finds out.

One habit helps more than any process. When you bring something to your product leader, be clear about whether you're sharing a worry or changing the plan. "I heard the budget might get cut" and "we're cutting the budget" land very differently, and a product leader who can tell which one you mean can hold onto the first and act on the second.

What relaying costs the team

The cost of a relayed false alarm isn't the meeting where it gets announced. It's everything that happens to the work afterward.

Gloria Mark at UC Irvine has spent years studying interruptions at work. In a 2005 field study, the people she observed had 57% of their streams of work interrupted, and as she described it to Gallup, the interrupted work people came back to the same day took an average of 23 minutes and 15 seconds to resume, and in between they typically worked on about two other things before returning. In a later lab study, she and her colleagues found that people compensate for interruptions by working faster, and pay for it in stress, frustration and time pressure, which showed up after only 20 minutes of interrupted work.

The background noise is already loud. Most teams spend their days fielding a steady stream of meetings, emails and chats. A Flopp and Twitch emergency lands on top of all that, and it's a much bigger interruption than a ping: it changes what everyone is supposed to be working on. And it doesn't interrupt one person. It interrupts everyone in the conference room at the same moment, which is the whole point of calling the meeting and also the reason it's so expensive.

Mark's numbers describe single interruptions. A relayed emergency is a pile of them at once, plus a change in direction, and getting a team back to where it was – its focus, its momentum, its sense of what matters – takes much longer than the meeting did. In my experience, it costs a week or two.

Absorb it instead of passing it on

The alternative is simple to describe. When the panic comes down to you, listen to it and say, "Yep, we'll take care of that." Then don't pass it on. Two days later, when it gets retracted, say, "Okay, good to know, thanks for the update."

Your team never knew. Their productivity never took the hit, and the projects already in flight weren't disrupted. Because nobody was task-switching, they kept delivering better work faster, which makes the people above you happier, and over time it reduces how often a Flopp and Twitch situation comes up at all. Leaders tend to escalate less when the team in question keeps delivering.

There's a second way to cut down on escalations, and it points back at the ProductPlan reading. If an escalation is what happens when an accountable leader can't see the reasoning behind the plan, then making the reasoning easy to see is part of the job, too. When the people above you can tell why the team is working on what it's working on, fewer of their worries need to turn into emergencies.

The same survey suggests why that's hard. In the full report, 40% of teams said their strategy, discovery, roadmap and launch plans live across multiple tools with limited or no integration, and only 22.5% said those activities live in one primary system. Asked how confident they were that people outside product understand the product strategy, respondents averaged 3 out of 5. A plan that nobody outside the product team can follow is a plan that invites escalations, and every escalation that turns out to be a false alarm is a week the team didn't need to lose.

Absorbing isn't the same as hiding

This only works with discernment. Some alarms are real, and they have to pass through. If the budget really is getting cut, or the company really is changing direction, your team needs to know, and sitting on it isn't protecting anyone.

The line I draw is between protecting and sheltering. Absorbing a false alarm so your team can keep working is protection. Withholding a real change in the landscape, so your team keeps working on something that no longer matters, is sheltering, and it's a failure of a different kind. There's no formula for telling them apart in the moment. It takes judgment every time, and that judgment is a big part of what the team is counting on you for.

The leaders I'd want to work for are the ones who can hear "drop everything" and decide, calmly, whether anything actually needs to be dropped.